Friday 26 August 2016

End of the maintenance month


Well its been a long month of aeration and sanding to the greens and surrounds but we have finally finished and now on to the next task. Overall the work went really well, the 1-9 greens a little dry, 10-18 just right and 19-27 a little wet. Considering we do the work spread across the month I would have taken those conditions before we started. We had enough dry days to work the sand into the holes 

and now enough moisture to promote recovery.

The initial greens are now looking in reasonable shape, I wouldn't say they are fully healed but they are smooth enough and healthy enough considering the disruption we put them through. We had to apply a preventative fungicide this week as we noticed fusarium appearing on a few of the wetter greens, this is usually not a problem at this time of the year however the sand we have applied has initiated development. The fungicide will stop any further spread for the next 4 weeks. As mentioned before we do intend to dress them again at some point however it will not be until into September now.

Last night we had a deluge of rain, 26mm to be exact. Heavy downpours which would normally have flooded the course and pooled on the greens for some time were nowhere to be seen this morning. However I took the opportunity to time some of the path ways whilst the machine was still on. But it was the perfect scenario to show why aeration and decompaction is vital to maintain healthy greens. Although this is the most evident straight after the work as the holes are still open in places the increase drainage will last for a number of months before compaction through machinery and foot traffic will start to effect the drainage once more. The rate of compaction increases substantially when the soils become wetter so playing on the greens in winter will lead to a poorer rate of drainage come spring, hence why its vital to do aeration once growth starts again April/May.
We used up some of the cores from 19-27 greens to fill in some uneven areas on the bank on 24. 
Next up is the long rough which we hope to start next week.

Tuesday 23 August 2016

Maintenance week 3


I'm back off a week away from the club, and straight back on with work to the greens. This time we are hollow tining, solid tining and sanding 19-27 greens. Unfortunately on Monday the weather was wet which delayed us getting started until 11 am. The rain was quite heavy at times but the tined greens coped with it well, showing the be fits of doing the work. The decompacted surfaces can drain much more freely. The 1-18 greens are now starting to fill in, the initial greens on 1-9 still showing a few holes. It was very dry when we did these greens and so struggled to get the final dressing of sand to bridge the top of the holes as on 10-18. As mentioned before these may need a further light application of sand. 
We have had a few volunteeers over the weeks helping with core collection so thanks go out to Rich Harsley, Jack Bowers, Lesley Mathers our greens chairman Colin Webster. The team have worked really hard over the last few weeks to get the work done and try keep on top of grass cutting across the course. 

The next big jobs we have coming up is to start the 16 th drainage ditch and start cutting the long rough down around the course ready for leaf collection. 

Tuesday 9 August 2016

Greens maintenance week 2


And so we go again, this time we are hollow tining and solid tining greens on holes 10-18. This is exactly the same procedure as week 1. For more information on this you can find it earlier on the blog. This week has been even more testing than last, as the conditions are drier than before, even though we have been hitting the greens with irrigation every night. The last few days have been very windy for the time of year, this hasn't helped, firstly the irrigation does not work efficiently in wind as the spray of water can be greatly effected, sometimes not reaching parts of some greens at all. The second problem it causes is evaporation, the wind dries the surface, reducing the moisture content of the soil, leaving the grass needing more water than is available. Hopefully the forecast is for a few showers over the next few days.


The tees therefore have received little to no water as we can not keep up with demand on the greens. Hand watering is being done on any dry areas of greens

The dry weather is having a big impact on the wear of the tines we are using here is one of the hollow tines after just 8 greens, we usually expect a tine to easily last 30 greens during moist conditions, the dry soil is more abrasive and wears down the metal at a rapid rate, so 3 sets of tines has been used instead of the usual one.

The lack of rainfall and wind is also leading to poor growing conditions, across the course grass is starting brown off, especially where there is no irrigation. This is good in the sense we can concentrate on our greens renovations without the need to get out and mow daily, however it is not good news in terms of greens recovery after the work we have done to them. Recovery is going to be slower than expected and I estimate we could be looking at double to average recovery time, so around 20 -25 days opposed to the usual 10, the initial greens we did last week on 1-9 have some holes still visible, again the dry conditions has allowed more of the sand applied to fall down the holes rather than bridge them at the surface. This shouldn't be a problem, however if we feel an extra light application of sand would benefit the smoothness of the putting surfaces then this will be applied in a couple of weeks.

We have also been fixing a few of the smaller irrigation problems such as sprinkler heads.

Thursday 4 August 2016

Greens maintenance week 1

Well this week we got stuck into the greens maintenance and thankfully the weather has been kind to us. Last weekend we got 7mm of rain and the use of the irrigation system has softened the greens to allow tining without to much damage.

We have hollow cored 1-9 greens using 12mm hollowcores to a depth of 130mm, they were then removed for the surface by the team and all debris blow off before the greens were tined again, this time using 12mm solid tines. Those to a depth of 250mm.

The reason we do the two processes is one, the hollow tines remove organic matter within the soil profile and allows it to be replaced with sand, and two the solid tines relieve compaction and also have the added benefit of getting sand deeper in the soil profile. This over time will increase drainage and get water deeper in the soil to encourage better rooting and the final goal of healthier grass.


A total of 29 tonnes of sand has been put on to the 9 greens we have done this week. The greens, due to their current dry nature has taken the sand well and a lot has fallen down the holes after brushing. More sand will probably have to be applied once the holes start knitting in, this is simply to smooth out the greens, usually you will get slight indentations around the holes, especially the hollow tine holes. A subsequent dressing of sand followed by a drag mat will help smooth this out. We can only apply a certain amount of sand within the maintenance window, if it was possible, we could apply slightly more straight after tining.

I must stress this is a once a year operation that has to be done at some point in the year. We feel this time of the year is the ideal time as recovery is the quickest it can be. I appreciate golfers will wonder why the greens are done right in the middle of the playing season, to be honest the playing season is a 12 month cycle nowadays. So there is no 'good' time to do it from that point of view. The rest of the year maintenance is planned to be of 'minimal' disruption, however it is ongoing throughout the year. We have had a lot of compliments regarding the course and the greens over the last few years and it all boils down to the work that is put in to them to get them that way and make play on them possible for a 12 month season.
 As you can see from the picture the sand we apply every year is beginning to show in the soil profile, the upper portion of the green core is dominated by sand and the roots penetrate deeper below this through the aeration holes. The amount of organic matter in the upper profile is not thick, matted or excessive and it smells aerobic (anaerobic soil smells like rotten eggs).

The full profile shows the problems we face regarding drainage, the lower profile is quite heavy soil which drains very poorly. With no drainage on the majority of greens, this can lead to poor upper surface drainage once the water table rises sufficiently during heavy rain, however during moderate amounts of rain the nature of the sandy top layers can cope and remain firm, the work we are doing can only improve this.

Next week we are starting on holes 10-18, repeating the same process as above. Greens on holes 1-9 will be back in play however will not be regularly cut until the sand on the surface reduces as this causes severe damage to the mowers when cutting in wet conditions. A poor cut due to blunted blades will quickly increase disease.

About Me

Im the Head Greenkeeper at Malton and Norton Golf Club. I began my greenkeeping career at Malton and Norton Golf Club straight from school as an Assistant Greenkeeper. Wanting to climb the greenkeeping ladder I gained my NVQ level 2 and 3 at Askham Bryan College. I continued with my education gaining a HNC in golf course management and took the position of Deputy Head Greenkeeper at Malton and Norton Golf Club in 2005.In 2008 I was promoted to the position of Head Greenkeeper, leading a team of 6 hard working and dedicated Greenkeepers. Our aim is to continue to improve the condition of the course year on year maintaining our high reputation within the area.