Thursday 10 January 2013

15th green drainage

drainage line running through the low points, turf cut and out let dug to check height
Adam and Rob working off boards to protect the green, remove the turf and the sandy rootzone near the surface
 
Half of the green dug out by hand, levels checked, pipe in gravel and 300mm of rootzone compacted into the trench

Second half of green started
Connection made to outlet
Job done, very tidy, turf back on and only a light roll needed