This week we are working on levelling the 21st tee, which has become increasingly un-level due to settlement. Once all the existing turf was lifted (to be used elsewhere), new levels were established and work began levelling the sub soil.
To ensure we get the final tee surface as level as possible, with the equipment we have available, we make a perfectly level perimeter. Here's Adam and Alistair installing the wooden guides.