Friday, 1 February 2013

Work continues at 13th

After yesterdays disastrous events with the trench on 13th we concentrated our efforts on draining the front bunker on 13th using the pipe work we installed. We connected the drain in to this then let the water out of the bunker which assured us that what we had installed works well.
As the front bunker is large enough to get machinery in we dug the trenches out with the excavator to save time and effort, ensuring constant fall in to the main trench. The pipe was then installed and back filled with pea gravel and topped off with sharp sand. This bunker will be topped up with sand in the near future. Now work has been carried out in front of the 13th and 17th, these holes will be back in play for the weekend.



 

About Me

Im the Head Greenkeeper at Malton and Norton Golf Club. I began my greenkeeping career at Malton and Norton Golf Club straight from school as an Assistant Greenkeeper. Wanting to climb the greenkeeping ladder I gained my NVQ level 2 and 3 at Askham Bryan College. I continued with my education gaining a HNC in golf course management and took the position of Deputy Head Greenkeeper at Malton and Norton Golf Club in 2005.In 2008 I was promoted to the position of Head Greenkeeper, leading a team of 6 hard working and dedicated Greenkeepers. Our aim is to continue to improve the condition of the course year on year maintaining our high reputation within the area.