Friday, 26 January 2018

Hedge work update

With no more improvement in the weather the work to the hedges is well under way. As mentioned in the last blog the 19th tee and the 7th hedge had been started. They are now finished, the 7th area has been tidied, however we will need to stump grind the remaining stumps before we can add a little soil and turf the area. The hedge along side the 18th green has also been lowered and is finished. Just removing the top 40-50 cm of those hedges around the greenkepers building has already saved a lot of time as we no longer need platforms or steps to work off. This time saving will be carried forward year on year.

If the ground conditions are still wet next week we will start reducing the height of the leylandii hedge at the rear of the 10th green and along side the 13th tee. There is some of the hedge that will need to be removed completely next to the 13th tee but this will be down to the weather as to when we can start it.


As the weather has been poor we have been unable to cut any grass, at this time of the year there is not a great deal of growth but the greens are usually cut fairly regularly to keep them tidy and encourage dense growth. This winter we have struggled to cut them at all, as we had a couple of days of drier weather we took the opportunity to start cutting them with the hand mower. Not all the greens are dry enough to cut but we have cut the better ones and have managed to cut 75% of the summer greens this week. We may get the opportunity to cut a few more next week if the conditions improve.


Thursday, 18 January 2018

Hedge changes


With the weather still not playing ball, we are starting the winter hedge changes across the course, just to remind all the reasoning behind all the changes, below is the agreed proposal which has been communicated to all members via email, minutes and on the information board.


Hedge Management Work


Following a recent visit from our health and safety contractor, feedback from staff, and concerns raised by members, the board have agreed to make changes to some of the leylandii hedges on the course.
Experts in golf course/woodland management also advise that certain trees can be inappropriate on golf courses. Leylandii are non-native and short lived with a lifespan of 30-40 years. As well as looking contrived and offering minimal wildlife value, they start to degenerate, split and can blow over after 25-30 years.
Access to many of the leylandii hedges is limited, therefore the contractor we use to cut all hedges on the course can’t cut some areas using the large tractor and flail, which are then left to be cut by hand using petrol hedge trimmers. Due to the position of some of the hedges access is restricted by slopes, fences, and uneven ground conditions.



The height and width of some of the leylandii also makes cutting difficult and dangerous. The greens staff use trellises and scaffolding boards to create a safe platform on which to work, which is acceptable if the ground is even, the platform is stable, at a safe height and reach is not unsafe. The safety advice given is that all hedges should not be excessively high, excessively wide or in areas where line of sight for golfers or staff, compromises safety. When hedges are excessively wide or high staff are more likely to over reach. From a platform of no more than 1.5m a member of staff should not be cutting above waist height, nor should the width of the hedge mean the member of staff is unduly reaching to cut across the top surface. We are advised that all hedges need not be more than 2m high and no more than a meter wide.
We have assessed all the hedges that are cut by hand and have agreed on the following course of action:


7th tee leylandii to be removed


This is the worst example on the course and it will be fully removed. The hedge stops clear line of sight for golfers on the 6th tee to golfers on the 7th tee, in a report written by our Health and Safety advisor he has stated that this hedge serves no purpose in protecting golfers from balls hit from the 6th tee, it stops line of sight from both tees and is something he would like removed for improved safety of golfers and staff.
It is located close to the 7th tee banking which makes it difficult to build a safe platform in which to cut the hedge. The hedge is excessively high at over 3 m and excessively wide at over 1.5m. Previously this hedge was cut from a ladder which was dangerous; it also took two people a week to cut. From a maintenance and cost saving point of view, removal of this section of hedge would save the club valuable time and money in the long term.
Once the hedge is removed low level shrubs (eg Portuguese laurel as we have behind the 11th green) or additional pines/ birch or hardwoods (with respect of the long term quality of the 7th teeing area) would be planted for extra screening. The trees that were planted to the rear of the 7th tee several years ago, were designed to create separation and screening from the 6th hole, which they now do. The additional trees will create the additional separation required.


12th hole leylandii, rear to be cut back


This stretch of leylandii would be left, as it is a great screen from neighbouring properties and an unsightly fence which separates our property from the Coach House property. The only hand cutting required on this hedge is the rear of the hedge and a small section on the top where the contractor can’t reach. To solve this and reduce time and risk, the rear of the hedge could be cut back to the stem, leaving no cutting to be done on the rear (leylandii will not grow from old wood, only from green growth). This would effectively narrow the hedge and the contractor should be able to cut the entire top section. The height would also be reduced by around 30 cm, this would reduce cutting, make cutting easier, however still screen the fence to the rear of the hedge.


13th tee leylandii, reduce height and width, remove sections


The leylandii around the 10th green/ 13th tee has been planted at 2 different times and therefore is in two different stages. The oldest section is double width and is around 4m wide and around 3.5m high. The newest section is single width and only 1m wide but is still 3.5m high. The newest section creates less of an issue, this is accessible for the contractor and can be cut relatively easily from the stone path side. We will however reduce the height of the whole hedge to no more than 2m, this would make any cutting easier on the green side and reduce risk, without compromising the effectiveness of that hedge.
The double width, older section is a real issue. The staff must hand cut all this section as due its position, height and width. The contractor can’t cut it due to the 13th tee and 10th green, as they would have to travel on the tee or greens surround to cut and would cause long term damage to the tee, bank and turf around and close to the green. Leaving the only option, to hand cut the majority of the hedge. Most of the top section is dangerous to cut by hand due to the height and excessive width, even reducing the height would not solve this issue. We can’t build a simple platform due to the tee banking, so must be cut from steps which we have been advised are not a suitable option for the amount of cutting required. The centre of the hedge can only be accessed by steps through the centre of the hedge plants, again this is not safe practice.
The solution is to remove the old, wider section of leylandii, due to its width, position and the fact it’s creating unsafe working conditions and to replant at single width and maintain to a safe height. Like the 7th tee, not only will it be then safe to maintain but reducing cutting will create huge cost savings to the club in the form of time/ labour saving.
To reduce the impact visually during transition to the new hedge we will remove one side of the current hedge (the 13th tee side), this would then look no different from the 10th green side, as that section would remain in the short term. Once removed we will replant the leylandii in single row to be like the newer section behind the remaining hedge, alongside the 13th tee, there is potential to reduce the length by around 10m near the 14th white tee and replanting using other plants (shrubs, trees), to maintain some separation between the 10th green and 13th/14th tee, but giving a softer visual feel when approaching from the 10th fairway.
As soon as the new section has matured the older section alongside the 10th green will then be removed. I would expect to have total transition to the new hedge within 5 years, sooner if possible depending on growth of the new hedge. Once fully changed there will be additional space around the 10th green which will only improve the playing surfaces in that area. Should the hedge remain the staff will not be able to cut any sections by hand.


18th green/ 19th path and tee, reduce height


This section of hedge is in an area of level ground. This allows us to erect a basic platform which is safe to cut from. The hedge is around 3m, we will reduce the height of the hedge to around 2m which would reduce cutting time but most importantly reduce risk to staff when cutting.


Cost of alterations would benefit the club to the equivalent of £2500 (time savings) approx. per year, significantly reduce the risk of litigation, and improve the overall playability and quality of the surfaces.


I appreciate not all members will agree with the advice or the changes, but we are obliged as a club to take the safety of golfers and staff seriously, and act upon the professional advice we have been given.

Work has begun on the hedge around the greenkepers building due to the poor ground conditions on the course, this area minimises travelling and can be done as and when conditions dictate.


Yesterday (17th Jan) ground conditions were remarkably improved due to a cold easterly wind and slight ground frost, therefore we took the opportunity to remove the 7th leylandii hedge. The team worked hard, with the assistance of our Greens Chairman Colin Webster, to ensure the work on the main sections were completed in that day. Fortunately most of the work has been completed with just some off cut branches to collect. Now this has been removed we will look to grind off the stumps and turf the area before planting a few more trees, in selected positions as not to cause similar issues. Not only will this solve any safety issues but the tee benefit from the increased light and air flow and the area to the left of the 6th hole will be easier to maintain due to less restricted access around the 7th tee.



We will hopefully continue with the 19th hedge and move on to the 13th when conditions are next suitable. As I'm writing this the course is once again covered in snow, ice and completely saturated due to 12mm of overnight rain and sleet thanks to storm Fionn. The weather certainly plays a big part in course playability, we have been incredibly lucky over the past 3 years to have such mild and playable conditions through December, January and February. This winter has been severe, wet and relenting, however I'm always optimistic that we are now heading in the right direction towards better weather.

During spells of drier weather we have been cutting other hedges around the course, these are the sections that cant be cut with the tractor flail. With the changes we have made to the hedges this task is becoming easier every year.

Bins, benches, and course posts, such as OOB, water hazards, fence and 150 yard post are all being stained and painted. Once again the team doing a great job to ensure the course looks its best come the playing season.


We have solid tined the greens with 13mm cross tines to allow air and water penetration and allow air to exit the turf when using the air2G2, which has been subsequently carried out. We will then move on to smaller 10mm tines nearer the growing season. Before spring the tees and surrounds will be solid tined with 13mm tines and sprayed with liquid iron to harden up the sward. Fairways are to be slit tined in two directions and solid tined in the worst and most compacted areas.




Wednesday, 3 January 2018

A Happy New Year



I hope all followers had a good Christmas and a Happy New Year. We start another year and hopefully a drier one than last. Over the Christmas period the weather continued to be poor and the course is really suffering because of it. It has been a few weeks now since the course was fully playable, there has been a mixture of holes closed and winter cups being used to keep the course open as much as it can be. However we are not alone, nearly every golf course that is comparable to Malton and Norton is in the same position and greenkepers around the country are toiling away doing there upmost to keep courses playable through what seems never ending poor weather.


It is at this point we have to be thankful that last year was the driest winter we have had for a long time and it coincided with the irrigation installation. I would not like to imagine the mess and chaos that would have been inflicted to the course if they were trying to install the irrigation this winter.

I'm fairly confident if we are patient and do not play on the course when conditions are not suitable we will be able to deliver a course in good condition come spring. I have witnessed many times at other courses and sometimes here when play is allowed during unsuitable conditions to see the long term damage come spring and summer. An example here at Malton is the 2nd green. A green with poor drainage due to the shape, position and soil used in construction, leading to saturated surfaces most of the winter. Last winter we tried to keep the green in play as much as possible leading to root and leaf tissue damage which was slow to recover in spring and not the surface we would like throughout the playing season. With no resolution to improve the drainage in the near future we have to take a more cautious approach this winter. Less damage when the grass plants cant recover should lead to a lot stronger plants come spring and summer when the greens need to be good. We have some work planned for the poorer greens but this will not address the bigger issue of subsurface drainage.

Drainage is still one of the biggest investments any golf course will need to make to battle against the weather in this country. Its an area which has no limits, at Malton and Norton we are aiming to continually improve all aspects of drainage and plans are in place to look at the most problematic areas to ensure we can remain playable in the worst of conditions. However there is a balance of what is affordable within the current budgets. The top championship clubs that aren't fortunate to be built on free draining land spend millions installing drainage and importing sandy soil which they construct the course out of, unfortunately we don't have that expenditure and therefore we need to be realistic about what is achievable on our site.

Looking back at the total rainfall last year we finished on 655mm, which is above average, but no where near the accumulations of 2012 when we nearly had 1000mm. As I mentioned last time it has been the timing of the rainfall that has been the issue this year. Around 75% of the annual rainfall has come in the Summer/ Autumn when the ground should be dry. Considering the wet conditions the course has only been fully closed 15 days. With 5 of those days due to snow. That shows the work we have done over the past 5 years on drainage and aeration has had some effect, as in 2012 we were closed 55 days.

Looking forward to this year we have very few big projects on the go, however we have a number of small but important tasks we need to schedule in to the next couple of months. Aeration is one of the key areas we will be focusing on, the greens will be micro tined, deep aerated using the air2G2 and slit tined to encourage new rooting. A number of small restoration projects will start including levelling out and removal of the old winter tees, these are becoming dangerous and are unnecessary. We will also attempt a couple of drainage improvements around the 14th and 16th. We will be continuing the tree work, pruning and thinning where needed, along with the hedge changes that have been approved, to the 7th and 13th tee areas.

Machine maintenance is high on the agenda at the moment, and is something that is good to concentrate on given the poor conditions on the course. all cutting units need striping down, cleaning and sharpening before the units are set ready for the start of the season.

Cleaning, staining and painting all bins, benches and posts has also begun, its a job that can be done inside when the weather is bad, however is also one that can be left when we are needed to get on with other course related maintenance.

All ditches, leaves and debris are continually being checked, its important to keep ditches running freely as any blockages will stop the natural drainage on the course. Most of the leaf litter is now collected from the course. Some areas are still too wet to access with vehicles and these are being done by hand. The clubhouse borders have been finished, most of the older shrubs have been cut back, to encourage new growth.


About Me

Im the Head Greenkeeper at Malton and Norton Golf Club. I began my greenkeeping career at Malton and Norton Golf Club straight from school as an Assistant Greenkeeper. Wanting to climb the greenkeeping ladder I gained my NVQ level 2 and 3 at Askham Bryan College. I continued with my education gaining a HNC in golf course management and took the position of Deputy Head Greenkeeper at Malton and Norton Golf Club in 2005.In 2008 I was promoted to the position of Head Greenkeeper, leading a team of 6 hard working and dedicated Greenkeepers. Our aim is to continue to improve the condition of the course year on year maintaining our high reputation within the area.